DELIVERY GUIDE
Flat-Pack vs Assembled Apparel Boxes
Ask for both formats to fit the same garment, usable size and finish. Compare the total cost through to a box ready to fill.
Request a Two-Format QuoteCompare on the same basis


Delivery format illustrations.
| Ask for | Assembled two-piece | Collapsible magnetic |
|---|---|---|
| Presentation | Lift-off lid and base. Check how the garment lifts out. | Hinged lid and magnetic closure. Check alignment after assembly. |
| Cartons | Quantity per carton, carton dimensions and gross weight, including any partial carton. | Record the same figures in the flat state, including loose components. |
| At the warehouse | Allow time to unpack, inspect and insert the garment. | Include forming the box and securing its corners in addition to unpacking and filling. |
| Delivery quote | Use the same postcode, quantity and requested delivery terms. | Use the same destination and ask which freight and local charges are included. |
How many shipping cartons will my order use?
Divide the order quantity by the boxes per full shipping carton. Count the whole cartons and add one carton if there are boxes left over. For volume in cubic metres, multiply each carton’s outside length × width × height in centimetres and divide by 1,000,000. Add the volume of a partial carton using its actual outside dimensions.
Worked example for 1,000 apparel boxes
Illustrative inputs for two offers, with the same order quantity and all cartons full. Use your supplier’s actual carton specifications for purchasing.
| Carton data | Assembled two-piece | Flat-pack magnetic |
|---|---|---|
| Boxes per full carton | 20 | 50 |
| Outer carton dimensions | 60 × 40 × 42 cm | 60 × 40 × 35 cm |
| Cartons for 1,000 boxes | 50 | 20 |
| Total carton volume | 5.04 m³ | 1.68 m³ |
Which box costs less when it is ready to fill?
Compare the total quoted box, paper accessories, setup, freight and work at your warehouse for the same usable box size and destination. Multiply assembly time per box by the number you expect to assemble, then apply your local labour rate. Divide each total by the number of usable boxes.
How much extra assembly can a flat-pack offer absorb?
Subtract the flat-pack total before local labour from the assembled total on the same basis. If flat-pack costs less at that stage, divide the difference by your warehouse labour cost per hour. That gives the maximum additional labour hours the flat-pack option can absorb before the totals are equal.
Send My Delivery RequirementsWhat to send for a delivery quote
Share the receiving country and postcode, target arrival date, box size, quantity and preferred delivery terms. For each format, ask for boxes per carton, outside dimensions, gross weight, the ready-to-ship date and the charges included in freight.
Can an apparel gift box ship without an outer carton?
For individual parcel delivery, plan to put a paperboard presentation box in a protective corrugated outer carton. Before shipping the presentation box on its own, have your fulfilment partner check the filled pack against the requirements of the chosen carrier and service.
Measure the outside dimensions and gross weight of the finished parcel for your freight quote. If empty presentation boxes first ship in bulk to a warehouse, quote that shipment separately from the individually packed parcels.
Check the rules for your route with your carrier. See the UPS parcel packaging guidance and FedEx packaging guidance.
Check the packed parcel before approval
- Build the parcel. Use the filled gift box, actual paper accessories, proposed outer carton and protective fill.
- Review the weak points. Check that the gift box cannot shift inside the carton. Inspect the corners, lid, surface finish and packed garment after a trial shipment or a test agreed with your fulfilment partner.
- Confirm the quote scope. Agree who supplies the outer carton, who packs the parcel and which shipping charges the quote covers.